What we do

Compliance with welding quality standards and the provision of competent welding / materials  engineering personnel is a pre-requisite for modern engineering projects. Cambrian Fusion are able to support all, or any of the following stages of a project:

Conceptual and Front End Engineering Design (FEED)

Detailed Design

Fabrication and Construction

Training and Performance Qualification

Auditing

Support and Troubleshooting

About Us

Cambrian Fusion Technology Ltd, established in 2010, provides a professional welding and materials engineering service to companies operating in high performance industries.

With over 25 years in the industry, we are Chartered Welding Engineers experienced in project managing welding and materials applications on a variety of fabrication / construction and manufacturing projects in diverse industrial sectors including; oil & gas, petrochemical, new nuclear build, nuclear waste encapsulation, cryogenic air separation, strategic defence, aerospace and scientific industries.

Project Examples

  • Cavendish Nuclear Ltd

    Cavendish Nuclear Ltd

     

    As part of the MEH JV Alliance for NNB GenCo Ltd, the erection and installation of circa 265Km of pipe spools for the Balance of Nuclear Island (BNI) mechanical erection contract for the £20Bn Hinkley Point C (HPC) new nuclear build project. Installation and field welding in accordance with the requirements of:

     

    • RCC-M – Design & Construction Rules for Mechanical Components for PWR Nuclear Islands.

     

    • BS EN 1090-2 – Execution of Steel Structures and Aluminium Structures, satisfying the Construction Products Directive.

     

    Managed under a Quality Management System according to BS EN ISO 3834-2 Quality Requirements for Fusion Welding of Metallic Materials.

  • Babcock Energy & Marine

    BP QUAD 204 Redevelopment Project - West of Shetland, UK Continental Shelf

     

    Fabrication of 73 subsea structures for the BP Quad 204 Redevelopment. These included 44 process fluid handling structures (including manifolds, flowline and riser terminations, and subsea isolation valve structures), and 30 control distribution structures (including multiple assemblies and umbilical terminations), amounting to a total of 2,300 tonnes of fabrication.

     

    Total – Ellon Grant Field Life Extension - Alwyn South Area, North Sea

     

    Fabrication of two 160 tonne subsea manifold and ICM containment structures for the controls upgrade and life extension of Total’s North Sea Ellon Grant asset.

  • Wood Group Integrity Management

    BP Andrew Area Development - Central North Sea

     

    Provision of fabrication, welding and materials engineering support to the BP Andrew Area Development Project for a new 700 tonne prefabricated Separation Module, new Hydraulic Power Unit (HPU), structural modifications, new topsides process pipework to allow integration of new and old systems, new riser caisson and umbilical at Andrew Platform.

     

    Support at sub-contractor fabrication/construction facilities in Aberdeen.

     

    PetroSA - Project Ikhwezi, Port Elizabeth and Mossel Bay, Republic of South Africa

     

    37km x 12” API 5L X65 main flow line including 4Km high temperature section clad with 825 alloy, and 3” MEG line. Qualifications to DNV-OS-F101. Client Welding & Materials Engineer for PetroSA during weld procedure qualification, welder/welding operator performance qualifications by All-Seas (pipe-lay contractor), and subsea installation of first 4Km of high temperature main flow line/MEG line.

  • Bilfinger Industrial Services UK Ltd

    Mechanical/Fabrication Term Maintenance Contractor (TMC) for:

     

    • BP Forties Pipeline System on-shore refineries at Grangemouth, Sullom Voe, and Seal Sands.
    • BP Exploration (now Perenco UK), Wytch Farm, Dorset.
    • BP Chemicals, Salt End, Humberside.
    • ExxonMobil, Fawley Refinery, Hampshire.
    • P66 (previously ConocoPhillips), Humber Refinery, Humberside.
  • Air Products & Chemicals Inc.

    Sasol Qatar Limited

     

    Manufacture of two 60m long x 6m diameter air separation units (ASU), from 5000 series aluminium, generating 7000 metric tonnes / day of liquid oxygen for Oryx GTL– Ras Laffan Phase 1 Gas Plant.

     

    NASA - Langley National Transonic Facility, Hampton, VA

     

    Manufacture of air separation unit (ASU), from 5000 series aluminium, generating 430 metric tonnes / day of liquid nitrogen and high purity liquid argon.

 

Contact

 Send us a Message

Tel: +44 (0) 7805 552 112

Email: enquiries@cambrianfusion.com

For more information, give us a call or...

Visit us at

Aaron Williams MSc CEng MweldI CEWE CIWE
Director / Chartered Welding Engineer

Submitting Form...

The server encountered an error.

Form received.

Website designed and powered by Fineline Print and Web

Legislative and  welding / fabrication quality standards and specification requirements

Welding and technology capability review and gap analysis

Development of welding specifications

Materials and welding consumables selection and procurement

Guidance on weld joint design and requirements for NDT

Scope weld procedure qualification requirements and testing program

Development and qualification of welding procedures

Welding engineering support and troubleshooting at fabrication / construction site

Auditing fabrication / construction site and sub-contractor welding activities

Welding engineering support and troubleshooting at fabrication / construction site

  • Cavendish Nuclear Ltd

    Cavendish Nuclear Ltd

     

    As part of the MEH JV Alliance for NNB GenCo Ltd, the erection and installation of circa 265Km of pipe spools for the Balance of Nuclear Island (BNI) mechanical erection contract for the £20Bn Hinkley Point C (HPC) new nuclear build project. Installation and field welding in accordance with the requirements of:

     

    RCC-M – Design & Construction Rules for Mechanical Components for PWR Nuclear Islands.

     

    BS EN 1090-2 – Execution of Steel Structures and Aluminium Structures, satisfying the Construction Products Directive.

     

    Managed under a Quality Management System according to BS EN ISO 3834-2 Quality Requirements for Fusion Welding of Metallic Materials.

  • Babcock Energy & Marine

    BP QUAD 204 Redevelopment Project - West of Shetland, UK Continental Shelf

     

    Fabrication of 73 subsea structures for the BP Quad 204 Redevelopment. These included 44 process fluid handling structures (including manifolds, flowline and riser terminations, and subsea isolation valve structures), and 30 control distribution structures (including multiple assemblies and umbilical terminations), amounting to a total of 2,300 tonnes of fabrication.

     

    Total – Ellon Grant Field Life Extension - Alwyn South Area, North Sea

     

    Fabrication of two 160 tonne subsea manifold and ICM containment structures for the controls upgrade and life extension of Total’s North Sea Ellon Grant asset.

  • Wood Group Integrity Management

    BP Andrew Area Development - Central North Sea

     

    Provision of fabrication, welding and materials engineering support to the BP Andrew Area Development Project for a new 700 tonne prefabricated Separation Module, new Hydraulic Power Unit (HPU), structural modifications, new topsides process pipework to allow integration of new and old systems, new riser caisson and umbilical at Andrew Platform.

     

    Support at sub-contractor fabrication/construction facilities in Aberdeen.

     

    PetroSA - Project Ikhwezi, Port Elizabeth and Mossel Bay, Republic of South Africa

     

    37km x 12” API 5L X65 main flow line including 4Km high temperature section clad with 825 alloy, and 3” MEG line. Qualifications to DNV-OS-F101. Client Welding & Materials Engineer for PetroSA during weld procedure qualification, welder/welding operator performance qualifications by All-Seas (pipe-lay contractor), and subsea installation of first 4Km of high temperature main flow line/MEG line.

  • Bilfinger Industrial Services UK Ltd

    Mechanical/Fabrication Term Maintenance Contractor (TMC) for:

     

    • BP Forties Pipeline System on-shore refineries at Grangemouth, Sullom Voe, and Seal Sands.
    • BP Exploration (now Perenco UK), Wytch Farm, Dorset.
    • BP Chemicals, Salt End, Humberside.
    • ExxonMobil, Fawley Refinery, Hampshire.
    • P66 (previously ConocoPhillips), Humber Refinery, Humberside.
  • Air Products & Chemicals Inc.

    Sasol Qatar Limited

     

    Manufacture of two 60m long x 6m diameter air separation units (ASU), from 5000 series aluminium, generating 7000 metric tonnes / day of liquid oxygen for Oryx GTL– Ras Laffan Phase 1 Gas Plant.

     

    NASA - Langley National Transonic Facility, Hampton, VA

     

    Manufacture of air separation unit (ASU), from 5000 series aluminium, generating 430 metric tonnes / day of liquid nitrogen and high purity liquid argon.

Aaron Williams MSc CEng MweldI CEWE CIWE
Director / Chartered Welding Engineer

CAMBRIAN FUSION

CHARTERED WELDING ENGINEERS

CAMBRIAN FUSION

CHARTERED WELDING ENGINEERS

Aaron Williams

MSc CEng MweldI CEWE CIWE
Director / Chartered Welding Engineer

Submitting Form...

The server encountered an error.

Form received.